On June 10, CRRC Sifang “cloud-signed” a cooperation agreement on the maintenance project for Argentina’s 709 intercity multiple train units with Argentina National Railway Corporation (SOFSE) via video, starting in-depth cooperation in train maintenance.
09

2020-06

On June 6, Nanning Metro Line 4 completed hot running and entered the train on-line commissioning stage.
08

2020-05

Amid the happy whistle, a fleet of tall “Dream Coach” for export to Saudi Arabia lined up, ready to depart. On May 8, CRRC Electric Vehicle officially delivered the new tourist coaches manufactured for Saudi Arabia.
04

2020-05

On May 4, the first fully automatic subway train made by CRRC Dalian for Taiyuan was transported to Xiaodiannan Depot of Taiyuan Metro Line 2.
03

2020-05

On May 3, the first two trains for Xi’an Metro Line 6 made by CRRC Dalian successfully arrived at Cepo Depot of Xi’an Metro Line 6, achieving high quality, high-efficiency and zero-error transportation.
24

2020-04

In this connected world, we are in the same boat to weather the storm together. After rushing to the relief of multiple countries suffering from the severe pandemic, CRRC continues to deliver epidemic prevention materials to Ukraine and German along the “Belt and Road”.
22

2020-04

On April 20, the overseas version “Dream Coach” rolled off the assembly line one by one slowly, indicating the successful completion of the order for export to Saudi Arabia!
10

2020-04

On April 8, CRRC Qiche successfully completed the loading of 20 tanks for concentrated sulfuric acid at Dalian port, which headed for Korea for delivery to KOS Limited.
16

2020-03

On March 10, the second batch of 3 DMUs exported to Angola by CRRC Tangshan Co., Ltd. were loaded on board in Tianjin Port and formally transported to Lobito Port in Angola. There are 10 DMUs in Angola Project, the first four of which were shipped to Angola from Tianjin Port on February 10 already.